Build-cost estimate
A broad planning estimate based on total floor area and finish level. Rates are loaded from public store settings when Supabase is configured.
Indicative range
KSh 4,000,000 – 6,000,000
Rates as of October 2026; vary by county and supplier. Estimates as of October 2026. Costs vary by county, site conditions, supplier and finishes.
Actual costs depend on county, soil, access, finishes, professional fees, services and approvals. Black cotton soil requires input from a registered structural engineer.